Many
Manuals
search
Kategorie
Marki
Strona główna
Datalogic
Switche sieciowe
Controller SC6000
Instrukcja Instalacji
Datalogic Controller SC6000 Instrukcja Instalacji Strona 12
Pobierz
Podziel się
Dzielenie się
Dodaj do moich podręczników
Drukuj
Strona
/
78
Spis treści
ROZWIĄZYWANIE PROBLEMÓW
BOOKMARKI
Oceniono
.
/ 5. Na podstawie
oceny klientów
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
BHS AND REDS INST
ALLATIO
N MANUAL
6
2
2.2
GENERAL SC
A
NNER M
OUN
TING
NOTE
For correct cabl
e positioning and routing see
par. 3.4 and par.
3.8.
2.2.1
Fast Bracket Mount
ing
Figure 4 - Fast Bracket Mounting
1
2
...
7
8
9
10
11
12
13
14
15
16
17
...
77
78
STANDARD
1
REDUNDANT SYSTEMS
1
BHS AIRPORT ARRAYS
1
CONTENTS
3
1 BHS AIRPORT ARRAYS
7
1.5 STANDARD BHS PACKAGES
8
2 MECHANICAL INSTALLATION
10
(2 pcs each)
11
2.2.1 Fast Bracket Mounting
12
2.2.2 Scanner Positioning
13
2.2.3 Scanner Mounting
13
MECHANICAL INSTALLATION
15
(drawing above)
16
3 CONNECTIONS
21
3.3 READER CONNECTIONS
23
3.4 CABLE CONNECTIONS
24
3.5 DIP SWITCH SETTINGS
25
PNP Connection Shown
26
3.8 CABLE ROUTING
28
3.9 GROUNDING
28
4 SOFTWARE CONFIGURATION
29
SOFTWARE CONFIGURATION
31
PS Offset Calibration
34
Resulting PS signal
38
4.6 FINAL CHECKS
40
4.7 COMMISSIONING
40
5.1 MAINTENANCE – LEVEL 1
41
5.1.2 DARP™ Backup
41
5.1.3 DARP™ Restore
41
5.2 MAINTENANCE – LEVEL 2
42
5.3 TROUBLESHOOTING
42
5.7 DL-NET (GENIUS™ ADD-ON)
44
6 REDUNDANT SYSTEMS
45
6.2 MECHANICAL INSTALLATION
47
Small Package Detecting
49
PS Line
50
6.2.4 Encoder Mounting
50
Alternative Encoder Mounting
50
6.3.1 DIP Switch Settings
51
6.3.2 REDS T-Label Station
52
6.3.3 REDS L-Label Station
53
6.5.1 Diagnostic Procedures
56
Configuration
57
Standby-Active Switch Over
58
6.5.2 WebSentinel Interface
59
Host Interface
60
6.5.3 Power Supply
61
6.5.4 Dual Ethernet
61
A INSTALLATION CHECKLIST
64
SUPPLIES
65
ARRIVAL ON SITE
65
ASSEMBLE THE FRAME AND ARRAY
65
MAKE BACKUPS
66
FINAL OPERATIONS
66
B COMMISSIONING CHECKLIST
67
C MAINTENANCE CHECKLIST
68
MAINTENANCE CHECKLIST
69
D ACCEPTANCE TEST PROCEDURE
70
TEST PROCEDURE:
71
RESULTS:
71
SHORT REPORT
72
No
72
E TEST CHARTS
73
Komentarze do niniejszej Instrukcji
Brak uwag
Publish
Drukuj dokument
Drukuj stronę 12
Komentarze do niniejszej Instrukcji